About Welding.
* We use CO2 welding, manual welding,Submerged arc auto welding and automatic welding.
*All weld surfaces should be visually inspected, the weld wave should be uniform, and the edges of the weld should be smoothly transitioned to the base metal.The shape and size of the weld should meet the requirements of the drawing, and the surface of the weld shall not have cracks, slag, unfused, porosity, weld tumors and arc pits; please check our product of 2200mm diameter marine buoys
*We use ultrasonic flaw detection technique to complete the welding testing
About Painting.
* We use epoxy paint.
*Shot peening pretreatment will be the first step, and then we will paint the anticorrosive paint within 4 hours after pretreatment.
*We use high pressure airless spraying as much as possible.
* For the parts that are difficult to spray, such as welding lines and frame edges, we usually brush one or two layers before formal coating.